Terms and conditions for the Energy Improvement Grant
1. Overview
The Energy Improvement Grant is a Hammersmith & Fulham Council scheme to provide funding assistance to Hammersmith & Fulham (H&F) residents interested in installing home energy improvement measures to improve their energy efficiency, cut their bills, and reduce their household emissions.
The scheme supports households by providing up to 50% of the costs of home energy improvements and whole home retrofit plans up to £5,000.
Any households in the London Borough of Hammersmith & Fulham with a gross household income lower than £87,348 per annum are eligible to apply.
2. Funding
The Energy Improvement Grant provides financial assistance to help residents improve home energy efficiency.
To access this grant, you must obtain a whole-house retrofit plan via National Energy Foundation, H&F trusted partner to deliver start to end domestic energy retrofit service and install measures.
The grant will match up to 50% of eligible costs, up to a maximum of £5,000 (excluding VAT).
Applicants must contribute the remaining 50% of costs through their own funding.
As part of the grant, households can also claim up to 50% of the cost of obtaining a whole-house retrofit plan (WHP) and planning permission application within the overall £5,000 limit. This claim must be included in the same grant application as the energy efficiency improvement work, as it will not be paid in advance under a separate application.
If applicants are seeking grant support for an air-source heat pump (ASHP) installation, they must also apply for the Boiler Upgrade Scheme (BUS) grant. The Energy Improvement Grant will then cover up to 50% of the remaining ASHP installation costs, up to a maximum of £5,000.
As detailed in the following section, only energy improvement measures are eligible for grant support. Other types of home improvement works are not eligible (for example, extensions and bathroom renovations).
3. Eligibility criteria
Eligible households
The fund is open to:
- freehold homeowners
- leasehold homeowners (subject to freeholder approval where required)
- private tenants (subject to landlord approval)
- private landlords
- council leaseholders.
Only households with a total gross household income (before tax) of £87,348 per annum or below are eligible to make an application to the scheme.
Where a private landlord makes an application, eligibility is determined based on the household income of the tenants of the relevant property.
Eligible measures
To apply for funding, you must have a healthy homes whole-house retrofit plan (WHP).
WHPs are comprehensive retrofit plans, tailored for a property through a home survey. WHPs lay out measures to install to reduce bills and emissions, considering specific budgets and consumption habits.
A WHP can be obtained through the National Energy Foundation, or if obtained from another provider, applicants must provide details of their actual energy consumption and running costs for the most recent 12-month period available to the retrofit consultant at the time of the home survey. For energy consumption, the kWh of gas and electricity are required. These can be found on your utility bills or smart meter app.
Number of applications per households
Each household may submit one application for funding retrofit installations every three years. If you are considering multiple measures, we recommend including them in a single application.
Air-Source Heat Pumps and the Boiler Upgrade Scheme
Grant support for ASHP installations already exists through the national Boiler Upgrade Scheme (BUS). This provides £7.5k grants to households to replace gas boilers with ASHPs.
Given BUS support already exists, households applying to the H&F Household Retrofit Grant scheme for support with an ASHP installation must apply to BUS.
MSC certified installers can support residents with this application.
4. Application requirements
Applicants need to provide the following information in their application:
- a list of measures to be installed
- a healthy homes whole house retrofit plan
- at least 3 quotes for works - for Solar PV and battery storage these must be from an MCS certified installer
- double/triple glazing should be installed by a FENSA approved contractor
- for insulation related work, the installation must be undertaken by a Trustmark registered contractor or an Installation Assurance Authority (IAA) framework member and follow the requirements of the quality assurance scheme
- 3 months of payslips and bank statements for each adult occupant
- a signed household income declaration
- written permissions from your landlord or freeholder approving the proposed work (if applicable)
- a valid planning permission if required (working with the planning and energy team)
- post retrofit energy bills (after installation collected by the council or its agent)
5. Evaluation and approval
Grant funding will generally be awarded on a first-come first-served basis for eligible applications. If your application needs planning permission and the approval process takes longer than others, the time of application received will still be recorded, and funding will be reserved for it.
Given total grant funds available are fixed, Hammersmith & Fulham Council reserve the right to end the scheme at any time. Any committed funding awards would be honoured in this scenario.
The council can advise whether funding is currently available and indicate the likelihood of your application being approved if submitted shortly afterwards.
Applicants should note that purchasing a whole-house retrofit plan (WHP) before grant approval is at their own risk, as the council cannot guarantee funding if the scheme closes before your application is processed.
Only energy efficiency measures recommended in the WHP will be considered for the award of grant funding.
The award of a grant is at the sole discretion of the council, and its decision will be final.
6. Payment details
Funding will be paid once the work is completed and the evidence specified below has been provided.
To receive payment, applicants must provide:
- an itemised and dated invoice for the completed works
- photographic evidence showing the property before and after installation.
If you use your own installers for:
- Solar PV and battery storage – an MCS certificate is required
- thermal insulation – evidence is required that the installer is TrustMark registered or a member of the Installation Assurance Authority (IAA) framework scheme, for example, logos and registration number displayed on invoice are acceptable
- windows and doors – evidence that the installer is a member of the FENSA scheme
- DIY loft insulation – a post-installation inspection carried out by your retrofit consultant is required. See DIY loft insulation in section 7.
Payments will be processed once all documentation has been reviewed and approved by the council.
7. Important conditions regarding approved applications
Employing contractors
The council takes no involvement in the employment of contractors to undertake the works.
The National Energy Foundation (NEF), our retrofit service partner, will provide you with a list of vetted installers. These installers will have been pre-checked to ensure they hold all appropriate industry installation accreditations, insurance cover and health and safety policies. In addition, they will offer optional warranties and insurance backed guarantees (including cover if an installer ceases trading) known as financial protection products.
Applicants are responsible for sourcing at least 3 quotes to ensure a cost-effective and informed decision when selecting a contractor. This can be a combination of vetted and resident-selected installers. See Using your own installers.
All quotations must be final quotations. This means the installation contractors quoting must have visited the property and completed their design and specification processes. Preliminary quotations will not be accepted.
The contract for the works will be between you and your installer. However, if the quote provided is higher than average, the council may ask you to obtain additional quotes for comparison. The council may monitor the progress of the works, but you, or your agent, are responsible for supervising your contractor.
It is accepted that residents may not wish to accept the lowest quotation e.g. preferred type and quality of products or installer service offer. Where all quotations for the same work are of a cost such that the full £5,000 grant is requested, not selecting the lowest quotation is permitted.
For applications with quotations below £5,000 in value, should the customer not wish to accept the lowest value quotation, a brief statement should be provided to the council explaining the reasoning.
The council cannot issue any direct instructions to the contractor and is not liable for any issues encountered before, during and after installation.
Using your own installers
Residents may choose to select and appoint an installer of their own choice, but please note this will be entirely at the resident’s own risk. Three final quotations are still required.
As part of the grant application, you will need to provide evidence that the installer is appropriately qualified and accredited. This is to ensure the retrofit works meet required quality standards.
Here is the list of accreditations required, which must be held at the time of installation work:
- Solar PV or battery storage: MCS accredited company
- windows and doors: FENSA scheme registered company
- insulation - Trustmark registered company or framework member of the Installation Assurance Authority (IAA).
Applicants or their agent should conduct their own due diligence when appointing installers.
It is recommended that applicants are satisfied with the following:
- warranties and financial protection products in place and offered by the company they intend to appoint
- Installer insurance cover type and levels
- Quality Mark protection, which includes financial security and work competency
- installer health and safety policy and procedures.
Note that MCS certified installers are obliged to purchase financial protection products on behalf of their consumers by the MCS for every installation they perform. Residents should request details from their chosen installer.
For added protection, when using a Trustmark registered company (who may also be MCS accredited), applicants may wish to ask their installer to assist them with purchasing a Trustmark Home Improvement Lodgement (current cost £45 plus VAT).
DIY loft insulation
While not recommended, this is accepted as long as it's recommended in the whole house plan by NEF’s retrofit consultant and they carry out a post installation inspection to approve the installation.
Invoices
On completion of the works, the invoice issued by the installer must be addressed to you, or your agent, and not to the council.
Liability
The London Borough of Hammersmith & Fulham cannot be held responsible for any damage or loss caused by installers working on your property. Should you have any concerns regarding loss or damage you should raise the problem with the contractor immediately. Further advice can be sought from the Citizens Advice consumer service on 0808 223 1133.
If you are dissatisfied with your contractor or agent, you should contact them to register a formal complaint under their complaints procedure. If you are using vetted installers, you should also notify NEF of your complaint. If using your own installers and you remain dissatisfied, you should contact the accreditation body, for example, MCS, Trustmark, FENSA, and IAA.
Changes to the project
Approval will be based on the schedule of works or plans agreed with the council.
If, for any reason, the works or the plans that have been agreed need to be changed, you must email climate-emergency@lbhf.gov.uk as soon as possible and have written approval from the council before you proceed.
If we do not agree any changes before work is carried out, this will affect the amount of funding assistance that you may receive, or the funding may be refused.
Ongoing maintenance
The council cannot guarantee the work completed by your contractor, nor provide assistance for the ongoing maintenance of any works or equipment installed.
Most contractors will guarantee their work for a period of 12 months for defective workmanship or goods. Any issues with the works must be taken up with the contractor by either yourself or your agent. Please ensure this is written in within your contract with the installers.
Maintenance, repair and any other future costs related to the works is responsibility of the household and not the council. We recommend you speak with your installer regarding maintenance and servicing requirements and the plans they offer.
Receiving permission
You are responsible for ensuring you have all the necessary permissions to install funded works and that it is completed by the installer stated in your application. The council will not be held responsible for any repercussions resulting from failure to obtain permissions.
You can also use the council’s planning tool to find out whether you need permission. Planning permission is not required before applying for funding, but you must receive initial approvals before installation begins.
Please note: If the property is located in a conservation area or is heritage-listed, refer the application to the Planning team for approval. This process can take at least 2 to 3 months.
Audit and inspections
10% of applicants will be randomly selected for an audit with an in-person inspection by a council staff member to confirm that the retrofit work has been completed.
By receiving the retrofit grant, applicants give consent for a potential site visit by the council. Once contacted, applicants are expected to schedule an inspection within a three-week window.
Lack of cooperation may result in the withdrawal of grant funding.
Last updated: 28 July 2026